roccabella

Press Release

The second tower of Roccabella is now on sale

Montreal, October 30th, 2014 – Due to the successful sales of the first tower of Roccabella, the developer, MC Finance, is pleased to announce the launch of sales for the second tower of the project.

A Remarkable Success

The luxurious units available at Roccabella have seduced downtown’s clientele, particularly due to their high-end Italian finishes. Successful sales in the first tower have thus prompted the developer to pursue commercialization of the second tower of the project.

About Roccabella

Roccabella is a project comprised of 40 floors of luxurious condominiums poised over a base of commercial space housing an array of services exclusive to residents. A saltwater swimming pool opening on a terrace and sundeck, a spa, a sauna and even a second terrace, located on the third floor, especially dedicated to residents are only a few of the services offered at Roccabella.

Roccabella benefits from a strategic location on René Lévesque W. Boulevard, between Mountain and Drummond Streets. A majestic covered entrance situated on René Lévesque Boulevard grants seamless access to the towers all year round, without being inconvenienced by weather or the numerous events hosted by the Bell Center.

The units at Roccabella, ranging from 736 to 2600 square feet, are distinctive, in great part, thanks to their high end finishes imported from Italy. Among the Italian made products are the kitchen, the vanities, the closet storage, the ceramic tiling and many other finishing details.

At the top of each tower, on the 40th floor, are two prestigious Penthouse units, each of which counting over 1000 square feet of outdoor terrace space and stunning views.

Progression of the project

Construction of the Roccabella is executed in two phases. The first consists of the entire base of commercial space, as well as the first residential tower, the Drummond Tower. As for the second tower, the Mountain Tower, it will be a part of the second phase of the project.

Phase 1 of the project has been under construction since March of 2013, and will be delivered by the end of 2015. The completion of the Mountain Tower, namely phase two, is expected for 2017.

For more information, please visit our website, or contact us at:

T.514 838-2000
info@roccabella.ca